Serving the East Midlands ● Nottinghamshire ● Derbyshire ● Leicestershire ● Lincolnshire ● Staffordshire ● Est. 2011 ● Over 10+ MW Installed ● MCS Accredited ● RECC Accredited ●
Serving the East Midlands ● Nottinghamshire ● Derbyshire ● Leicestershire ● Lincolnshire ● Staffordshire ● ● Est. 2011 ● Over 10+ MW Installed ● MCS Accredited ● RECC Accredited ●

Solar Panel Installers Allestree

Looking for solar panel installers in Allestree? Spectrum Energy Systems fits MCS-certified solar PV and battery storage, plus EV chargers, across Allestree and the north of Derby, from Park Farm and the old village to Darley Abbey and Markeaton, and out to Quarndon, Duffield and Little Eaton. We design each system around your roof and your electricity use and send an all-inclusive quote, normally within 48 hours, with a site survey before we install.

Get Your Solar Design & Quote In Allestree

Solar Panel Installers Allestree

Spectrum Energy Systems are MCS-certified solar installers covering Allestree, Derby's northernmost ward, between the A6 and the A38 with Allestree Park on its doorstep. We design and fit solar PV and battery storage for homes and businesses across DE22, whether that is a 1930s house near the old village, a 1960s house around Park Farm or Blenheim Drive, or a building on the university's Kedleston Road campus.

Est. 2011
15 Years in Solar
10+ MW
Connected with sister company Spectrum Wind Services
MCS
Certified
4 to 6
Weeks, Enquiry to Install

Allestree Postcodes and Areas We Cover

Allestree is in the DE22 postcode district, which it shares with Darley Abbey, Markeaton and the Mackworth Estate inside the city and with Quarndon, Mackworth and Kedleston in Amber Valley. North and east, Duffield is in DE56 and Little Eaton and Breadsall are in DE21, and we cover all of those too.

DE22
DE56
DE21
  • Allestree village: around St Edmund's Church and the conservation area designated in 1991
  • Park Farm and Blenheim Drive: the 1960s and 1970s estates around Park Farm, whose shopping centre opened in 1963
  • Markeaton: about a mile and a quarter south-south-west, beside Markeaton Park and its own conservation area
  • Darley Abbey: under a mile south-south-east, towards the Derwent
  • Quarndon: about a mile north-north-west, just over the boundary in Amber Valley
  • Breadsall and Little Eaton: about a mile and three quarters east and north-east, in Erewash and the DE21 district
  • Mackworth and the Mackworth Estate: about two miles west-south-west and south-west
  • Duffield: about two and a half miles north up the A6, in DE56

Solar designs we've done in Allestree

These are real 3D roof designs from Spectrum quotes in Allestree, for homes and businesses. Every solar quote we send includes one for your own roof, showing where each panel goes.

3D roof design showing 14 solar panels on a roof in Allestree, DE22
Allestree, DE22: 14 panels, 6.86 kWp

Get your own roof design

Commercial Solar Allestree

Installers fitting solar panels on a large commercial roof, solar installers serving Allestree

The University of Derby has its main Kedleston Road campus inside the Allestree ward, on the old Markeaton golf course site where the Derby and District College of Technology opened in 1964. The campus, the Park Farm Centre and the schools, including Allestree Woodlands with more than 1,300 pupils, use most of their power in daylight.

That daytime demand is what makes commercial solar pay. For an organisation in Allestree that uses most of the output itself, payback is typically around 4 to 8 years.

We handle the design, the grid application and maintenance afterwards, and businesses can claim capital allowances on the system cost (your accountant can confirm the relief). Read our guide to solar for businesses or see our case studies.

Residential Solar Allestree: Landlords and Developers

Aerial view of new-build homes each with rooftop solar panels, solar installers serving Allestree

Allestree grew in two waves, first in the 1930s and then in the 1960s and 1970s around Park Farm and Blenheim Drive, and it became part of Derby in 1968. For a landlord with a house from either period, adding solar and a battery is one of the more direct ways to lift a rental's EPC rating; for a developer on an infill site, it counts towards Part L.

We run portfolio jobs as one project, with phased installs and Part P certification. Read about solar for property portfolios or new-build developments.

Domestic Solar Panels Allestree: Homeowners

Solar panels on a home roof with scaffolding in place during installation, solar installers serving Allestree

On an Allestree house the panels run the home through the day, and a battery keeps the surplus for the evening peak instead of exporting it. We cover the whole ward, from the streets around the old village and Park Farm to Markeaton and Darley Abbey.

If you live in the Allestree conservation area, Article 4 directions made in 1993 cover alterations to named houses, so we look at whether your house is one of them before we plan the layout.

Domestic solar and battery installs are zero-rated for VAT, currently due to run until 31 March 2027 (the rate is set by when the job is installed and invoiced), and you are paid for exported power through the Smart Export Guarantee. We can add battery storage, EV charging and, if you want it, Home Assistant with Predbat as an optional extra.

What Matters for Solar in Allestree

Planning and Conservation

Derby City Council handles planning for Allestree. Two of the city's 16 conservation areas are here, Allestree village centre (designated in September 1991) and Markeaton, covering the park and its surroundings (September 1975), and Derby's Article 4 directions of 1993 add controls on named houses in the Allestree area covering alterations such as doors, windows and roof materials. Allestree Hall and St Edmund's Church, with its Romanesque doorway, are both listed. Quarndon, Duffield and Mackworth come under Amber Valley Borough Council, and Little Eaton and Breadsall under Erewash.

Grid Connection

Allestree is on National Grid Electricity Distribution's East Midlands network, the same as the rest of Derby and Duffield to the north, and MPANs here normally start with 11. A standard home system is notified under G98 once it is running; a bigger one goes through G99 before connection, and we make either application for you.

Homes and Roofs

Allestree Park covers over 319 acres of parkland, lake and woodland and is a Local Nature Reserve; its golf course closed in December 2020 and was returned to parkland. The listed Allestree Hall, built of millstone grit in the early 1800s, stood empty for years and is now being turned into a wedding venue, after planning permission was granted in January 2026. Around the park and the old village are the 1930s streets and the larger estates of the 1960s and 1970s.

Get Your Allestree Solar Feasibility Assessment

We look at your roof and your electricity use and send an all-inclusive quote with the projected savings and payback, with no obligation.

Kit, Warranties and Guarantees

Solar inverters mounted on a plant room wall, solar installers serving Allestree

We fit tier-one panels (30-year performance warranty on the models we use most), Solis hybrid inverters supplied with a 10-year warranty, and Fogstar batteries on most homes or Pylontech on larger commercial systems, and we can usually supply another make if you prefer; see our solar technology.

Every installation carries our 5-year workmanship guarantee and a QANW insurance-backed guarantee on top of the manufacturers' warranties, and Spectrum is insured through QBE UK Limited (£10M employers' liability, £5M public and products liability, £1M professional indemnity).

Accredited and Insured

MCS Certified · NIC200223 NICEIC Approved · 3182878 RECC Member · 00080159 QANW Insurance-Backed Guarantee

How It Works

We start with a satellite view of your roof and your electricity use, then send an all-inclusive design and quote (subject to site survey), normally within 48 hours. A site survey confirms the details, we handle the grid paperwork, and most homes are installed in 1 to 2 days, around 4 to 6 weeks from first enquiry; our installation guide explains each step.

What Our Customers Say

★★★★★

"I had two quotes and went with Charlie. He kept in touch and followed up with all my queries and getting to understand how everything works. Fitting the panels and equipment was very straight forward."

Gail Liley

Frequently Asked Questions

Does the Allestree conservation area stop me having solar panels?

Not in itself. Solar on a house in a conservation area is often still permitted development, but Derby's 1993 Article 4 directions add controls on named houses in the Allestree area, and listed buildings always need consent. Tell us your address and we find out whether yours is affected.

Do you cover Darley Abbey, Quarndon and Duffield as well?

We do. Darley Abbey and Markeaton are part of Derby like Allestree, while Quarndon, Mackworth and Duffield are in Amber Valley and Little Eaton and Breadsall in Erewash; the only difference is which council handles any planning question.

Who is the network operator for Allestree?

National Grid Electricity Distribution, East Midlands. If your MPAN does not begin with 11, an independent network may supply your street, and we check that before we apply.

Are solar panels worth it in Allestree?

For most homes and businesses, yes. Payback is typically around 8 to 10 years for homes and 4 to 8 years for businesses, depending on your tariff and how much of the power you use yourself.

How much do solar panels cost in Allestree?

We quote one all-inclusive price for your roof and your usage, covering scaffolding, labour, the grid application and certification, and the quote shows the projected savings and payback before you commit. Some grid connections also carry a network operator fee, typically around £153 plus VAT.

Do you offer finance?

No, we are not a credit broker. We give you a clear written quote to take to your own lender if you want to borrow, and we do take card payments if you want to use a credit card offer.

Solar Panel Installation Coverage Map: Allestree

We install solar and battery storage across Allestree and the DE22 postcode in the north of Derby.

From Allestree we also cover Darley Abbey and Markeaton to the south, Quarndon and Duffield up the A6 to the north, and Breadsall and Little Eaton to the east.

Get Your Allestree Solar Quote

Whether it is for your business, your rental properties or your own home, we will design it and send an all-inclusive quote, normally within 48 hours.

Contact our solar team:

|
|
✉️ Email Us
📍 Serving Allestree and north Derby
Spectrum Energy Systems
Domestic & commercial · MCS-certified

Before you go: get your solar design & quote

Thinking about solar for your home or business? We’ll design a system sized to your actual usage and send you a clear, fixed quote with your projected generation, savings and payback. It all starts with a free remote roof and energy assessment, no site visit needed.

Prefer to talk? Call 0115 773 7575