Serving the East Midlands ● Nottinghamshire ● Derbyshire ● Leicestershire ● Lincolnshire ● Staffordshire ● Est. 2011 ● Over 10+ MW Installed ● MCS Accredited ● RECC Accredited ●
Serving the East Midlands ● Nottinghamshire ● Derbyshire ● Leicestershire ● Lincolnshire ● Staffordshire ● ● Est. 2011 ● Over 10+ MW Installed ● MCS Accredited ● RECC Accredited ●

Solar Panel Installers Stafford

Looking for solar panel installers in Stafford? Spectrum Energy Systems fits MCS-certified solar PV and battery storage, plus EV chargers, across Stafford and the ST16, ST17 and ST18 postcodes, from Littleworth, Baswich and Wildwood to Holmcroft, Highfields and Walton-on-the-Hill. We design each system around your roof and your electricity use and send an all-inclusive quote, normally within 48 hours, with a site survey before we install.

Get Your Solar Design & Quote In Stafford

Solar Panel Installers Stafford

Spectrum Energy Systems are MCS-certified solar installers covering Stafford, the county town between the M6 and Cannock Chase. We design and fit solar PV and battery storage for homes and businesses across ST16, ST17 and ST18, whether that is a railway terrace in Castletown, a family home in Wildwood or a unit near junction 14 of the M6.

Est. 2011
15 Years in Solar
10+ MW
Connected with sister company Spectrum Wind Services
MCS
Certified
4 to 6
Weeks, Enquiry to Install

Stafford Postcodes and Areas We Cover

Stafford covers ST16 for the north and centre, including Coton, Doxey, Castletown, Holmcroft and Littleworth, ST17 for the south and east, including Baswich, Weeping Cross, Wildwood and Rowley, and ST18 for the villages around the town. We also cover the neighbouring ST15 (Stone), ST21 (Eccleshall) and ST19 (Penkridge) districts.

ST16
ST17
ST18
ST15
  • Littleworth: just east of the centre, home to the Perkins Engines factory
  • Castletown and Doxey: west of the centre; Castletown has railway terraces from the 1830s and 1840s
  • Holmcroft and Parkside: north-north-west; Parkside was built in the 1970s
  • Highfields and Rising Brook: south of the centre; Highfields was begun as a council estate around 1955
  • Baswich and Wildwood: south-east; Wildwood dates from the 1970s
  • Burton Manor: south-south-west, where a conservation area Article 4 direction covers solar that fronts a highway
  • Walton-on-the-Hill and Milford: east-south-east, near Cannock Chase
  • Great Haywood: about four and a half miles east

Solar designs we've done in Stafford

These are real 3D roof designs from Spectrum quotes in Stafford, for homes and businesses. Every solar quote we send includes one for your own roof, showing where each panel goes.

3D roof design showing 17 solar panels on a roof in Stafford, ST18
Stafford, ST18: 17 panels, 8.5 kWp
3D roof design showing 16 solar panels on a roof in Stafford, ST17
Stafford, ST17: 16 panels, 7.84 kWp

Get your own roof design

Commercial Solar Stafford

Installers fitting solar panels on a large commercial roof, solar installers serving Stafford

Stafford's larger employment sites include Redhill Business Park off the A34 near junction 14 of the M6 and Beacon Business Park on Weston Road, and 36 hectares are allocated to extend the Primepoint employment area next to junction 14. The town also has GE's transformer works, Perkins Engines at Littleworth, Bostik on Common Road and MOD Stafford at Beaconside.

Factory, office and warehouse roofs with daytime loads suit commercial solar, and we also cover shops and workshops in the town centre. Most commercial systems pay for themselves in around 4 to 8 years, depending on how much of the power is used on site.

We handle the design, the grid application and maintenance afterwards, and businesses can claim capital allowances on the system cost (your accountant can confirm the relief). Read our guide to solar for businesses or see our case studies.

Residential Solar Stafford: Landlords and Developers

Aerial view of new-build homes each with rooftop solar panels, solar installers serving Stafford

The Plan for Stafford Borough allocates about 3,100 homes north of the town, about 2,200 to the west and about 600 to the east, and Burleyfields is being built with 786 homes. Developers can use solar towards Part L compliance, and landlords can use it to lift EPC ratings on older terraces.

We run portfolio jobs as one project, with phased installs and Part P certification. Read about solar for property portfolios or new-build developments.

Domestic Solar Panels Stafford: Homeowners

Solar panels on a home roof with scaffolding in place during installation, solar installers serving Stafford

Solar lowers the electricity a Stafford home has to import, and with a battery more of the day's generation gets used in the evening. We cover the whole town, from Castletown and Littleworth to Baswich, Wildwood, Holmcroft and Highfields.

New estates such as Burleyfields can be on an independent network rather than NGED, so we check the MPAN on your bill before we apply for the grid connection.

Domestic solar and battery installs are zero-rated for VAT, currently due to run until 31 March 2027 (the rate is set by when the job is installed and invoiced), and you are paid for exported power through the Smart Export Guarantee. We can add battery storage, EV charging and, if you want it, Home Assistant with Predbat as an optional extra.

What Matters for Solar in Stafford

Planning and Conservation

Stafford Borough Council is the planning authority. Most home solar is permitted development, but the council says those rights are reduced in conservation areas and National Landscapes. Stafford's conservation areas include the Town Centre, designated in 1971, Forebridge, Foregate and St Georges, Walton on the Hill and Burton Manor Village, where an Article 4 direction removes permitted development for solar that fronts a highway. Cannock Chase National Landscape lies south-east of the town, with Brocton and Milford on its edge. We check your address before we design.

Grid Connection

Stafford is on National Grid Electricity Distribution's West Midlands network, which runs from Congleton to the outskirts of Bristol. Smaller systems go in as a G98 notification and larger ones need G99 approval, and on new estates such as Burleyfields, where mua runs the independent network, we check your MPAN first.

Homes and Roofs

Stafford's housing includes railway terraces in Castletown from the 1830s and 1840s, the Highfields council estate begun around 1955, and 1970s estates at Parkside and Wildwood. The town centre has the Grade I church of St Mary and the Ancient High House of 1595.

Get Your Stafford Solar Feasibility Assessment

We look at your roof and your electricity use and send an all-inclusive quote with the projected savings and payback, with no obligation.

Kit, Warranties and Guarantees

Solar inverters mounted on a plant room wall, solar installers serving Stafford

We fit tier-one panels (30-year performance warranty on the models we use most), Solis hybrid inverters supplied with a 10-year warranty, and Fogstar batteries on most homes or Pylontech on larger commercial systems, and we can usually supply another make if you prefer; see our solar technology.

Every installation carries our 5-year workmanship guarantee and a QANW insurance-backed guarantee on top of the manufacturers' warranties, and Spectrum is insured through QBE UK Limited (£10M employers' liability, £5M public and products liability, £1M professional indemnity).

Accredited and Insured

MCS Certified · NIC200223 NICEIC Approved · 3182878 RECC Member · 00080159 QANW Insurance-Backed Guarantee

How It Works

We start with a satellite view of your roof and your electricity use, then send an all-inclusive design and quote (subject to site survey), normally within 48 hours. A site survey confirms the details, we handle the grid paperwork, and most homes are installed in 1 to 2 days, around 4 to 6 weeks from first enquiry; our installation guide explains each step.

What Our Customers Say

★★★★★

"I had two quotes and went with Charlie. He kept in touch and followed up with all my queries and getting to understand how everything works. Fitting the panels and equipment was very straight forward."

Gail Liley

Frequently Asked Questions

Do I need planning permission for solar panels in Stafford?

Usually not, but permitted development rights are reduced in conservation areas and on Cannock Chase, and in Burton Manor Village an Article 4 direction means solar that fronts a highway needs planning permission. Any application goes to Stafford Borough Council.

Which part of the grid is Stafford on?

National Grid Electricity Distribution's West Midlands network. Some new estates are on an independent network, so we check your MPAN before we apply.

Which areas around Stafford do you cover?

We cover Doxey, Castletown, Holmcroft, Baswich, Wildwood, Walton-on-the-Hill, Milford, Brocton and Great Haywood, and Stone and Penkridge nearby.

Are solar panels worth it in Stafford?

For most homes and businesses, yes. Payback is typically around 8 to 10 years for homes and 4 to 8 years for businesses, depending on your tariff and how much of the power you use yourself.

How much do solar panels cost in Stafford?

We quote one all-inclusive price for your roof and your usage, covering scaffolding, labour, the grid application and certification, and the quote shows the projected savings and payback before you commit. Some grid connections also carry a network operator fee, typically around £153 plus VAT.

Do you offer finance?

No, we are not a credit broker. We give you a clear written quote to take to your own lender if you want to borrow, and we do take card payments if you want to use a credit card offer.

Solar Panel Installation Coverage Map: Stafford

We install solar and battery storage across Stafford and the ST16, ST17 and ST18 postcodes.

From Stafford we also cover Stone to the north, Penkridge to the south, and Rugeley and Cannock Chase to the south-east.

Get Your Stafford Solar Quote

Whether it is for your business, your rental properties or your own home, we will design it and send an all-inclusive quote, normally within 48 hours.

Contact our solar team:

|
|
✉️ Email Us
📍 Serving Stafford and Staffordshire
Spectrum Energy Systems
Domestic & commercial · MCS-certified

Before you go: get your solar design & quote

Thinking about solar for your home or business? We’ll design a system sized to your actual usage and send you a clear, fixed quote with your projected generation, savings and payback. It all starts with a free remote roof and energy assessment, no site visit needed.

Prefer to talk? Call 0115 773 7575