Solar Panel Installers Hinckley
Looking for solar panel installers in Hinckley? Spectrum Energy Systems fits MCS-certified solar PV and battery storage, plus EV chargers, across Hinckley and Burbage, including Sketchley and Wykin, and villages such as Sapcote, Barwell, Earl Shilton and Stoke Golding. We design each system around your roof and your electricity use and send an all-inclusive quote, normally within 48 hours, with a site survey before we install.
- MCS Installers
- Complete Solar Solutions
- Established Since 2011
Get Your Solar Design & Quote In Hinckley
Solar Panel Installers Hinckley
Spectrum Energy Systems are MCS-certified solar installers covering Hinckley, the hosiery town on the A5 whose built-up area, with Burbage, had 50,712 people in 2021. We design and fit solar PV and battery storage for homes and businesses across LE10, whether that is a Victorian house near the town centre, a new home at Sketchley Park or a warehouse at Hinckley Park.
Charles Fletcher, founder of Spectrum Energy Systems, is PRINCE2 certified with 15 years in solar and wind energy, and designs, costs and signs off every quote.
Hinckley Postcodes and Areas We Cover
Hinckley is the LE10 postcode district, which also covers Burbage, Sharnford and Aston Flamville, and over the Warwickshire border, Wolvey. We cover all of LE10 and the neighbouring LE9 (Barwell, Earl Shilton, Stoney Stanton, Sapcote, Elmesthorpe) and CV13 (Market Bosworth, Stoke Golding) districts.
- Town centre: Castle Street and Regent Street, in the Hinckley Town Centre conservation area
- Druid Street: a conservation area of hosiery factories, mostly built between 1887 and 1903
- Burbage: south-east of the town, with its own parish council and conservation area
- Sketchley: south of the town centre, including new homes at The Lodge at Sketchley Park
- Wykin and Hollycroft: north-west of the centre; Hollycroft is a conservation area
- Barwell and Earl Shilton: north-north-east and north-east, where a 2,500-home extension to Barwell has outline permission
- Stoke Golding and Market Bosworth: north-west and north-north-west, towards Bosworth
- Sapcote and Stoney Stanton: villages to the east-south-east and east
Example Solar Installations
Solar designs we've done in Hinckley
These are real 3D roof designs from Spectrum quotes in Hinckley, for homes and businesses. Every solar quote we send includes one for your own roof, showing where each panel goes.

Commercial Solar Hinckley
Hinckley sits where the A5 meets the M69. Its main business sites are Hinckley Park at junction 1 of the M69, where Amazon and DPD have large units, Mountpark Hinckley, which is under development, and MIRA Technology Park on the A5 west of the town. Triumph Motorcycles has been in Hinckley since 1990, and Dodwells Bridge Industrial Estate is off Jacknell Road.
Warehouse and factory roofs with daytime loads suit commercial solar, and we also cover smaller firms in the town centre and on the older industrial estates. For firms here, payback typically falls around 4 to 8 years, depending on how much of the power is used on site.
We handle the design, the grid application and maintenance afterwards, and businesses can claim capital allowances on the system cost (your accountant can confirm the relief). Read our guide to solar for businesses or see our case studies.
Residential Solar Hinckley: Landlords and Developers
Hinckley's older housing grew up with its hosiery trade, and new homes are being built around Burbage and Sketchley, with a 2,500-home extension to Barwell given outline permission. Solar helps developers meet Part L on new plots and helps landlords improve EPC ratings on the town's older houses.
We run portfolio jobs as one project, with phased installs and Part P certification. Read about solar for property portfolios or new-build developments.
Domestic Solar Panels Hinckley: Homeowners
In Hinckley and Burbage, panels cut the power you buy and a battery holds on to the daytime surplus so you can use it in the evening. We cover the town, including Sketchley and Wykin, and villages around it such as Sapcote and Stoke Golding.
If your home is in one of the town's conservation areas, the council says panels on a wall facing a public highway need permission, and some individual properties have had permitted development rights removed by planning condition, so we check the address before we design.
Domestic solar and battery installs are zero-rated for VAT, currently due to run until 31 March 2027 (the rate is set by when the job is installed and invoiced), and you are paid for exported power through the Smart Export Guarantee. We can add battery storage, EV charging and, if you want it, Home Assistant with Predbat as an optional extra.
What Matters for Solar in Hinckley
Planning and Conservation
Hinckley and Bosworth Borough Council, based at the Hinckley Hub on Rugby Road, is the planning authority. Most home solar is permitted development, but the rules are different for listed buildings, such as the Church of the Assumption of St Mary and St Catherine's in Burbage, and can be in the borough's 28 conservation areas, which include Hinckley Town Centre, Druid Street, Hollycroft and Burbage. We check your address before we design.
Grid Connection
Hinckley is on National Grid Electricity Distribution's East Midlands network, with its own bulk supply point. Smaller systems are notified under G98 and larger ones go through G99 approval. On a newer estate we check your MPAN in case an independent network supplies it.
Homes and Roofs
The Druid Street conservation area preserves late Victorian and Edwardian hosiery factories, most built between 1887 and 1903, and a 1935 Art Deco office, and the town centre has historic streets around Castle Street and Regent Street. Newer homes include The Lodge at Sketchley Park and Chestnut Acres on Lychgate Lane in Burbage.
Get Your Hinckley Solar Feasibility Assessment
We look at your roof and your electricity use and send an all-inclusive quote with the projected savings and payback, with no obligation.
Kit, Warranties and Guarantees
We fit tier-one panels (30-year performance warranty on the models we use most), Solis hybrid inverters supplied with a 10-year warranty, and Fogstar batteries on most homes or Pylontech on larger commercial systems, and we can usually supply another make if you prefer; see our solar technology.
Every installation carries our 5-year workmanship guarantee and a QANW insurance-backed guarantee on top of the manufacturers' warranties, and Spectrum is insured through QBE UK Limited (£10M employers' liability, £5M public and products liability, £1M professional indemnity).
Accredited and Insured
How It Works
We start with a satellite view of your roof and your electricity use, then send an all-inclusive design and quote (subject to site survey), normally within 48 hours. A site survey confirms the details, we handle the grid paperwork, and most homes are installed in 1 to 2 days, around 4 to 6 weeks from first enquiry; our installation guide explains each step.
What Our Customers Say
★★★★★
"Fantastic experience from start to finish! The team at Spectrum provided clear, honest advice and helped me understand my solar options without any confusion. The installation was smooth, professional, and completed on time. The difference in my energy bills has been incredible! Their post-installation support was also excellent, checking in to ensure everything was working perfectly. Highly recommend their services to anyone considering solar energy!"
Andy Stafford
Frequently Asked Questions
Do I need planning permission for solar panels in Hinckley?
Usually not. Most rooftop installations on homes are permitted development. It is different for listed buildings, can be in conservation areas such as the town centre, Druid Street, Hollycroft or Burbage, and some properties have had their rights removed by planning condition. Any application goes to Hinckley and Bosworth Borough Council.
Do you cover Burbage and the villages around Hinckley?
Yes. We cover Burbage, Sketchley, Wykin, Barwell, Earl Shilton, Sapcote, Stoney Stanton, Stoke Golding and Market Bosworth.
Which electricity network is Hinckley on?
National Grid Electricity Distribution's East Midlands network covers Hinckley. Before we apply, we read the MPAN on your bill to rule out an independent network on a newer estate.
Are solar panels worth it in Hinckley?
For most homes and businesses, yes. Payback is typically around 8 to 10 years for homes and 4 to 8 years for businesses, depending on your tariff and how much of the power you use yourself.
How much do solar panels cost in Hinckley?
We quote one all-inclusive price for your roof and your usage, covering scaffolding, labour, the grid application and certification, and the quote shows the projected savings and payback before you commit. Some grid connections also carry a network operator fee, typically around £153 plus VAT.
Do you offer finance?
No, we are not a credit broker. We give you a clear written quote to take to your own lender if you want to borrow, and we do take card payments if you want to use a credit card offer.
Solar Panel Installation Coverage Map: Hinckley
We install solar and battery storage across Hinckley, Burbage and the villages around them.
From Hinckley we also cover Barwell and Earl Shilton to the north-east, Market Bosworth to the north-north-west, and Nuneaton over the Warwickshire border to the west-south-west.
Solar Installation Around Hinckley
We also cover these nearby areas:
Get Your Hinckley Solar Quote
Whether it is for your business, your rental properties or your own home, we will design it and send an all-inclusive quote, normally within 48 hours.