Hendre Milk Vestas V29, North Wales

Product: Vestas V29, 30m Tower, Location: North Wales. Date of Installation: April 2017

Our client approached Spectrum to provide a cost alternative against an X29 from Endurance. Together with the ongoing issues surrounding Endurance and the strength of our refurbished Vestas V29, we were awarded the contract to supply and install a V29 on land owned by Hendre Llwyn Y Main Farm near Abergele.

The turbine was sourced in Sweden and the tower cut into two 15m sections. Having re-welded towers in situ before, this did not cause us any problems. The turbine was re painted both in situ and in our refurbishment facility, as per the planning requirements and successfully installed to meet the tariff deadline for FiT accreditation.

Spectrum also oversaw the HV/LV connection for the client as this had some complicated detail to it.
The installation was a complete success and the turbine is performing well.

If you are a land owner looking to develop a wind turbine on your land, why not call us to find out how we can help.